Amsterdam Map by Jazzberry Blue

Buy this illustration Amsterdam Map by Jazzberry Blue on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.
1 Personalize your artwork

Choose your material

From ArtFrame™ to wall-filling wallpaper. Pick your favorite and make it truly yours.

More options available
Material More about this material

Choose your size

From a small frame to a statement piece. Choose what fits your interior!

Choose your size

More options available
Size
Complete set or interchangeable Art Print?
Choose the color of the frame
Aluminum frames
Wooden frames New
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
€ 187,-
Art code 1747404
Art code copied
Amsterdam Map by Jazzberry Blue
You can't see it in full detail right now, but you certainly will on your wall soon!
Scroll to zoom in, drag to move the artwork. Drag with your finger to move the artwork.
View artwork larger
Close
Edit background and wallpaper
Example of the artwork in a room
See it at home, on your wall
Download our app and enter work code 1747404
Art code copied
Download for iOS Android
Already filled more than 375,000 walls!
5,138 customers rate us with a 4.7 / 5
Read our reviews
Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
  • Example of the artwork in a room
Get even more inspired

Get even more inspired

Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Example of the artwork in a room
Artist impression (not based on the entered sizes)
Made by

Jazzberry Blue

Canada

About ‘Amsterdam Map’ by Jazzberry Blue

from the collection of 1x

Original created by Jazzberry Blue.

Discover our ArtFrame

The modern canvas alternative

Your chosen art on a textile print, stretched in an aluminum or wooden frame. Quick and easy to change for a fresh look and exactly as you want it.

  • High-quality print
  • Easily replaceable
  • Acoustic function
  • Large formats possible
More about ArtFrame
Meet the artist
Jazzberry Blue
Canada

I'm Jazzberry Blue, a contemporary artist known for vibrant, abstract creations that blend fluid forms and dynamic color palettes. My work, inspired by geometry and organic shapes, invites viewers on a visual exploration of movement and emotion. Each piece is a fusion of intuitive design and a deep love for color theory, offering a fresh perspective on modern abstraction. My art is perfect for collectors seeking unique pieces that transform spaces into vivid,…

Visit shop
4.7/5
Close

Your preferences

Choose the country you want the artwork shipped to.

Shipping country not available? Get in touch.