Alkmaar (Noord-Holland) | Map | Black and White by Prints of Place

1 Personalize your artwork
Material More about this material
Size
Complete set or interchangeable cloth?
Choose the color of the frame
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
162,-
Or pay 3x 54.00 via Klarna
Preview at home
Art code 1023861
Alkmaar (Noord-Holland) | Map | Black and White by Prints of Place
See it at home, on your wall
Download our app and enter work code 1023861
Download for iOS Android
Already filled more than 325,000 walls!
4,289 customers rate us with a 4.8 / 5
Read our reviews
Get even more inspired

Buy this illustration Alkmaar (Noord-Holland) | Map | Black and White by Prints of Place on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.

About "Alkmaar (Noord-Holland) | Map | Black and White"

by Prints of Place

About the artwork

Black and white map, street map or street plan of Alkmaar. Alkmaar is located in the municipality of Alkmaar, province of North Holland. The city map includes all public roads in Alkmaar. Furthermore, the map features the coordinates of the center of Alkmaar.

Prints of Place Profile picture

About Prints of Place

This shop is the destination for anyone in search of unique city posters that are a perfect reflection of their favorite city or village. In the Netherlands, Germany, America, and beyond.

With a passion for travel and a love for design, we embarked on our journey with.. Read more…

Customer reviews

This artwork doesn't have reviews yet. 4,289 customers rate us with a 4.8 / 5

    Beatrice O.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in June 2019
    Siegfried P.
    Germany
    4 / 5
    Verified review from Trusted Shops Ordered in December 2019
    Mandy S.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in July 2025
    J S.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in April 2023
    Diana van Helden
    Netherlands
    5 / 5
    Verified review from Google Ordered in November 2019
    Marielle
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in January 2023
    Marcel Pietersen
    Netherlands
    5 / 5
    Verified review from Google Ordered in April 2019
    Anja V.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in February 2020
    Christina Korbee
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in May 2021
    Stephan
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in March 2020
    Susanne M.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in July 2020
    joke voortman
    Netherlands
    5 / 5
    Verified review from Google Ordered in March 2021

About the material

ArtFrame™

Interchangeable Art Prints

  • High-quality print
  • Easily interchangeable
  • Acoustic function
  • Large sizes available

More about ArtFrame™