Map of Winschoten abstract by Maps Are Art

1 Personalize your artwork
Material More about this material
Size
Complete set or interchangeable cloth?
Choose the color of the frame
ArtFrame comes as a simple construction kit. View self-assembly instructions.
2 Choose extra options
Acoustic material
Total price
191,-
Or pay 3x 63.66 via Klarna
Preview at home
Art code 225916
Map of Winschoten abstract by Maps Are Art
See it at home, on your wall
Download our app and enter work code 225916
Download for iOS Android
Already filled more than 325,000 walls!
4,289 customers rate us with a 4.8 / 5
Read our reviews
Get even more inspired

Buy this modern artwork Map of Winschoten abstract by Maps Are Art on canvas, ArtFrame, poster and wallpaper, printed on demand in high quality.

About "Map of Winschoten abstract"

by Maps Are Art

About the artwork

The coloured areas on the map are all the buildings of the city of Winschoten. Each decade of the last century has a separate colour. Blue is the oldest, from before 1900, and brown/Orange areas are the most recently built. In the city centre, all buildings that stand against each other are coloured after the oldest building in the row. This makes the old city centre more visible.

On my youtube channel: De Kaartkunstenaar, there is a video showing the expansion of Winschoten dynamically on the map.

The data of the buildings with the year comes from the BAG, the basic registration of all buildings and addresses in the Netherlands. The map itself was created using a combination of different programming methods and it was finished by hand in graphics editing programmes. Besides this map of Winschoten, maps of other major Dutch cities can also be found in this collection.

Maps Are Art Profile picture

About Maps Are Art

Mapmaker, geography enthusiast, GIS expert and all-round creative... Read more…

Customer reviews

This artwork doesn't have reviews yet. 4,289 customers rate us with a 4.8 / 5

    Carmen K.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in January 2023
    Linda K.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in May 2019
    Robert jan
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in October 2019
    Kerstin K.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in November 2021
    Melissa
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in January 2022
    Gabi B.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in June 2022
    Henk Jaap Kloosterman
    Netherlands
    5 / 5
    Verified review from Kiyoh Ordered in August 2022
    Gerald H.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in August 2019
    love life
    Netherlands
    5 / 5
    Verified review from Google Ordered in April 2019
    Dick
    Netherlands
    4.5 / 5
    Verified review from Kiyoh Ordered in November 2021
    Iris S.
    Germany
    4 / 5
    Verified review from Trusted Shops Ordered in February 2024
    E. H.
    Germany
    5 / 5
    Verified review from Trusted Shops Ordered in September 2019

About the material

ArtFrame™

Interchangeable Art Prints

  • High-quality print
  • Easily interchangeable
  • Acoustic function
  • Large sizes available

More about ArtFrame™